This project modernizes the SR 432 Corridor by grade separating the SR 432/SR 433 Intersection and by extending the Port of Longview's Industrial Rail Corridor north of the intersection to accommodate future growth in unit train activity. There are three major components of this project: 1. Expansion of the Port of Longview Industrial Rail Corridor on-site and north of SR 432 intersection to accommodate future unit train traffic from area marine terminals. 2. Construction of 2nd...
Organization: SW Washington (RTPO)
Category: Modernize
StatusConceptual Updated: 6/24/2013
The project will add lanes an rebuild structures beginning at Mile Point 76.15, ending at Mile Point 81.21. The current conditions of this section of I-5 between the cities of Centralia and Chehalis are at capacity with existing demand. This is the last segment of I-5 in the Chehalis/Centralia area slated for capacity and safety improvements.
Organization: SW Washington (RTPO)
Category: Expand
StatusActive Updated: 6/24/2013
2010-WSTC-H This project constructs a principal arterial that will extend from Fruitvale Boulevard, cross over (or under) the BNSF Railroad mainline, run through the sawmill development site and connect to the future County road from Terrace Heights. The roadway will be constructed to a 61-foot width (14-11-11-11-14) providing a two-way left-turn lane, and outside lanes that will be shared with bicycles. Continuous 7-foot wide sidewalks will be constructed on both sides of the road, along...
Organization: Yakima Valley Conference of Governments (RTPO)
Category: Expand
StatusProposed Updated: 5/1/2013
The Port of Klickitat County, WSDOT, and partners are proposing a grade separation project to provide freight and automobile access into the port’s Bingen Point property over the main Burlington Northern and Santa Fe rail line. The proposed project will improve access to regional employers including Insitu (Boeing) Custom Interface, and SDS Lumber. The project will improve safety by providing an additional vehicle access point that does not have a rail conflict.
Organization: SW Washington RTC
Category: Modernize
StatusProposed Updated: 4/15/2013
Project Description · What is it? West Horton Road will be extended as a secondary urban arterial street with sidewalks, bicycle lanes, turn lanes, and signals at Aldrich and Northwest. · Where is it located? Phase 1 = From current terminus to Aldrich Road and Phase 2 = From Aldrich Road to Northwest Road. What is the intended outcome & benefit? East-west multimodal connectivity between two major arterials. Increased access, safety...
Organization: Whatcom Council of Governments (RTPO)
Category: Expand
StatusProposed Updated: 2/28/2013
This project will replace the SR 20/Sharpes Corner signalized intersection with a modified roundabout, a bypass lane for traffic heading west to Anacortes and a single-lane tunnel for traffic heading east from Anacortes towards Burlington. A second roundabout would also be built half a mile to the south on SR 20, to address traffic flow problems at the Miller-Gibralter intersection, which could be increased once traffic flow is improved by the Sharpes Corner roundabout.
Organization: Skagit/Island (RTPO)
Category: Modernize
StatusProposed Updated: 2/7/2013
This project will improve the 119th Street corridor to arterial standard. The road improvements will include four travel lanes, a center left turn lane/median, bicycle lanes, and sidewalks. The first segment, 72nd Av. to Curtin Creek will go to construction in 2014.
Organization: SW Washington RTC
Category: Expand
StatusActive Updated: 2/4/2013
The project constructs a new rail access route that eliminates existing conflicts with high-speed intercity passenger rail and a major rail freight corridor. It will relocate facilities to provide a new entryway into the port terminals, and provide internal storage capacity that will accommodate multiple unit-trains at one time (trains more than 150 rail cars in length).
Organization: SW Washington RTC
Category: Expand
StatusActive Updated: 2/4/2013
This project will finish the SE 1st Street/Lake Road corridor between 164th Avenue and 192nd Avenue. The The project will include 3 lane section between approximately 168th and 176th Ave. where the right-of-way is narrow. East of roughly 176th Av. the roadway will be 5 lanes with bike lanes and detached sidewalks, the intersections of 192nd and 164th Avenues will include additional approach lanes.
Organization: SW Washington RTC
Category: Expand
StatusActive Updated: 2/4/2013
This project will construct a vehicle/pedestrian overpass over the BNSF Railway north-south mainline in the City of Ridgefield, and remove two existing at-grade crossings.
Organization: SW Washington RTC
Category: Expand
StatusActive Updated: 2/4/2013
The NE 94th Avenue/Padden Parkway intersection project will complete a major improvement at the intersection to accomodate existing traffic volumes and improve safety. Improvements include upgrading traffic signal, adding turn lanes and acceleration lanes, and improving non-motorized travel.
Organization: SW Washington RTC
Category: Expand
StatusActive Updated: 2/4/2013
Construct two travel lanes with center turn lane, bike lanes, sidewalks, street lights, and landscaping. Project will also include the installation of water, sewer, and stormwater infrastructure. Project will realign offset intersection of Grace Avenue at Main Street.
Organization: SW Washington RTC
Category: Modernize
StatusActive Updated: 2/4/2013
Convert/upgrade existing rural-standard two-lane roadway to urban principal arterial standard including minimum two travel lanes, center turn lane, bike lanes, sidewalks, landscaping, lighting and traffic control. This project includes construction of a regional multi-use path on south side of roadway. Provide a direct link to future I-205 interchange. Interchange construction to begin in 2014.
Organization: SW Washington RTC
Category: Expand
StatusActive Updated: 2/4/2013
Convert/upgrade existing rural-standard two-lane roadway to urban minor arterial standard including minimum two travel lanes, center turn lane, bike lanes, sidewalks, landscaping, lighting and traffic control.
Organization: SW Washington RTC
Category: Expand
StatusActive Updated: 2/4/2013
This project will complete corridor improvements by constructing a new arterial roadway between a newly constructed roundabout and an existing arterial. The project will relieve congestion and reliance on an existing 2-lane substandard rural roadway in poor condition and allow for substantial industrial and commercial development to occur near Interstate 5. The project will include 2 travel lanes in each direction with a center turn lane, bike lanes and pedestrian facilities.
Organization: SW Washington RTC
Category: Expand
StatusProposed Updated: 2/4/2013
1 to 15 of 152  Next >

Predefined Project Searches


Project Category

Expand Map
Maintain Map
Modernize Map

Project Type

Preservation/Maintenance Map
Safety Map
New Facility Map
GP Capacity Map
HOV Capacity Map
Transit Map
ITS Map
Intersections Map
Non-motorized Map
Other Map